| The newly-finished bathroom - 6 years ago |
After the abortive
attempt to sell 'Millstone Cottage' earlier in the year, my letting agent became quite
concerned about the 'damp problem in the bathroom' highlighted (along
with the roof) by the guy's surveyor. I didn't want it to become such
a problem that my tenant would decide to leave so thought I'd better
send the boys round to see what was going on. In the event, only one
member of the building team of 'Bodgit and Scarper' was able to
attend site and what he had to report was not encouraging! The tiles
at the tap end of the bath appeared to be held on by gaffer tape and
moved at the slightest touch, and the floor area next to the bath was
so rotten that you could push a finger into it! My ex (I have never
worked out if he is 'Bodgit' or 'Scarper') offered to help me get the
bath out but could not help much more as he was busy on other jobs
so, on a Monday morning three weeks ago, I loaded up my little car
with my toolbox and several other boxes and bags of equipment and
drove over to the cottage.
The sight that met me
was daunting to say the least and became more so once we had removed
the bath. Left alone in what had once been a nice bathroom, I set to
work to find out the extent of the damage. As I removed tiles from
the walls I was confronted by plasterboard walls that had turned to
soggy porridge and which collapsed at the slightest touch – in the end I
took all of the plasterboard off to a height of about 4 feet, and 5 feet
at the tap end of the bath. Behind the plasterboard and between the
stud walling was expanded polystyrene insulation which had soaked up
the moisture like a sponge, so that all had to come out too. Although
very damp the timber of the stud walling had not got any rot in it
and, after three days and nights of running the dehumidifier, had
dried out quite well, so that was one good thing!
![]() |
| Devastation! |
Once I had removed all
of the problem walling and deposited it outside, I could turn my
attention to the floor. Using a jigsaw, I cut across the chipboard
flooring boards and removed the soggy, rotten pieces. As this was
trial and error I ended up having to make a second cut to get
rid of all the rot. Under the chipboard flooring was more insulation
– luckily, this time it was the type with dense foam sandwiched
between two foil skins, and did not appear to have been affected by
the water, which was just as well as beneath that and on top of the
DPM (Damp Proof Membrane) was a sizeable puddle! I was still none the
wiser, at this point, as to where all this water had come from as
there had been no leaks from the pipework under the bath. At first I
thought that my first ever attempt at tiling had been so rubbish that
water from the shower had been seeping through cracks in the grouting
over the last five years and soaking down the walls but, as the days went by and I exposed and
treated more areas of damp, I became convinced that the water had
actually been soaking up the wall not down and this would
suggest that a large amount of water had been spilled over the bath
and found its way through the flooring to the DPM and then soaked up
the plasterboard, which acted as a wick. Whether one of my previous
tenants had allowed the bath to overflow or had a shower without
using the shower screen, I will never know, but that is what I
suspect.
![]() |
| Re-instatement begins |
Armed with some basic
measurements, I went off to see the wonderful lads at the local
builders' merchants. They are total stars and never fail to come up
with workable solutions to my many and varied problems. I ordered new
flooring board, a cement board instead of plasterboard (unaffected by
damp conditions) and new insulation for the walls and it was all
delivered and off-loaded into the cottage that same afternoon! There
then began the arduous task of re-instating the bathroom. I must
admit I would rather work on a completely new project than try and do
remedial work!
One of the biggest
headaches was the tiling – six years ago I bought standard 6” x
6” white tiles from B & Q and some border tiles with a blue
'bubble' pattern on. I had put one border about three tiles down from
the ceiling and the other one about three tiles up from the bath and
this border had had to be removed. There was no way to successfully
remove the tile adhesive from the back of the tiles without breaking
some and I had no spares so Jeni and I headed off to B & Q at
Yeovil (first time I've been to Yeovil in decades!). Firstly, the
border tiles that I'd seen online and thought would look OK with the upper border,
looked all wrong and were thicker too, so would have stood proud from
the surrounding tiles and secondly, the standard white tiles were a
different white! I had already tried three other outlets and all
three had different shades of white so, at this point I gave up and
resigned myself to having white tiles that DID NOT MATCH! Aaagh –
my OCD-side was considering ripping the whole lot off the wall and
starting again from scratch but, in the end, I managed to quell my
revulsion, bought the white tiles and some blue mosaic tiles to cut
up for the border and we headed back.
My friend (and
landlady) Mary came to help me do the tiling and we were getting on
brilliantly – she was putting adhesive on the tiles, handing them
to me and I was slapping them on the wall – until we came to
inserting the border tiles. It was at this point that we realised
that, although we had carefully fixed a batten in a horizontal
position from which to get our datum line, the original tiles ran
slightly downhill towards the tap end! (I had obviously tiled to the
line of the bath originally and not to a measured horizontal) With a
resigned and defeated air I prised all of the tiles back off the wall
and we cleaned them and the wall – an entire afternoon's work
wasted – we could have cried. The next day I went back and had
another go and eventually got the spacings correct so that it didn't
look too awful (I'll definitely never be able to live there
again, now!)
My ex kindly came back and helped plumb the bath back in so that I could finish the tiling, seal the edges, put back the shower screen and seal that and then repaint two walls that had become stained/damaged by the damp, re-box in the pipework and lay carpet tiles! Phew!
It took two weeks of
almost daily visits to complete the project and although I could
appreciate the glorious view from the cottage once more, I was
heartily sick of the place by the end. I hate working in a confined
space, especially with someone else's belongings around and no space
to manoeuvre materials and tools. I was just relieved that, on the
days when I had to cut flooring board and wall board, the weather was
dry enough for me to work outside. During this time my poor tenant
became a displaced person and was camping on friends' floors, I
think. Needless to say I've let him off the rent for those two weeks.
On the last evening
that I was there, desperately trying to lay carpet tiles before I had
to go off for a farm sit the next morning, my good friend, Grainne,
who lives just around the corner, asked me up for a cuppa before I set
off home. I gratefully accepted but said I would be a little while
yet and about half an hour later I received another text 'I've made
spaghetti bolognese, would you like some?' What a lifesaver! I was so
tired that I wasn't sure I could safely drive home and a meal and a
glass of wine and some catch up time was just what I needed to
recharge the batteries. Brilliant!
I just hope that,
whatever caused the damp problem in the first place, does not
re-occur as I do not want to have to tackle that job again, but at
least I have extended my DIY skills a bit more – now, should I
tackle roofing next??
![]() |
| The newly-refurbished bathroom - last week! |