![]() |
| The rotten floor boarding |
Have you noticed that
heroes and super-heroes often have a trusty sidekick? Sherlock Holmes
had Watson; the Range Rider had Dick West (the All American Boy); the
Lone Ranger had Tonto; Roy Rogers had Trigger; Batman had Robin;
Dangermouse had Penfold; and Superted had Spotty! Quite often the
reason for these sidekicks was to act as a sounding board for ideas
and theories and also to step in on the odd occasion when the hero
was in too much trouble to get out by himself.
Unfortunately for me,
Super-WWOOFer (so designated by my daughter), has not had the benefit
of her sidekick, 'The Navigator', as her day job (as Jeni Oborn,
mild-mannered secretary and PA), has kept her from my side. Even the
local ex- hero, Super-Pooman (ex-hubby, Barry – so-called because
he used to be a herdsman on a local farm) has turned into a grumpy
old man with two replacement knees, and his faithful sidekick,
Shitty-Mutt (liked to roll in badger poo!) has long since gone to
doggy heaven. So, basically, I was on my own.
The task at hand? To go
to my cottage and sort out the kitchen floor! When I went to look
round it a few weeks ago to assess its condition, the first thing
that I noticed (and so will anyone else) was that the floor in the
kitchen was very uneven and the vinyl was torn. It was obvious that
water had got under the vinyl and that the flooring board we had laid
on top of the concrete had acted like a sponge and then swelled up.
I decided that the best
way forward was to remove the rotten boarding and replace the vinyl
with ceramic tiles. However, when Barry and I replaced the original
ceramic tiles (they were a hideous mottled pink colour) we had laid
the flooring boards wall-to-wall and then built in the kitchen units
on top, which seemed like a good idea......at the time. Obviously, I
couldn't take out the units so I would have to cut out as much of the
damaged board as possible – but how?
At this point I went to
my local builders' merchants, CRS (where I know the boss), and asked
for advice. They suggested using a circular saw so off I went to the
local hire shop and hired one for the next day as they didn't have
one in stock.
That night I found I
had a flat tyre so, bright and early, I went to the local tyre place
to get it fixed. However, it wasn't the tyre that was the problem –
the wheel rim had rusted through and the air was bubbling out through
the metal work! They put on my space-saver spare wheel (what is the
point of those?) and I spent an hour or so of precious floor-cutting
time, trawling round the local scrap yards looking for a spare
Peugeot wheel rim. Luckily I found one at my second scrapyard about
ten miles away, bought it and took it back to have my tyre refitted.
Towards lunchtime I finally got back on track and started removing
the floor. It was a horrible job as the circular saw was quite a
chunky one, vibrated a lot and spat out flakes of chipboard and
sawdust everywhere. It also left a margin of about 1.5 inches (38mm)
all round the units, so my initial idea of putting down a floor
screed and laying the tiles on the top level with the original floor
wouldn't work, as a margin of chipboard would be visible. I also
discovered that Barry had screwed the boards down in certain places
and the screws had rusted solid so, after prising the boards over the
screws, I then had to hit them at the base with a hammer and chisel
to break them off. Finally, I had as much of the old, damp mildewy
boards removed as possible and carried them outside and then it was
time to go back to the builders' merchants!
They suggested sealing
the concrete with a bitumen coating and then relaying new chipboard
flooring board on top, so that it was level with the old floor, and
then tiling over the whole lot, as long as it didn't stop any doors
opening. In that respect, my luck was in as, raising the floor by the
depth of the tile, would not affect anything too much. I ordered the
flooring boards but couldn't take them with me as they come in 8 foot
(2400mm) by 2 foot (600mm) lengths, so later that afternoon they were
delivered. The guy unloaded them for me and put them outside the
cottage and then I encountered the next problem – getting them into
my cottage as I thought it might rain. It's difficult to describe how
awkward it was to manoeuvre the boards into the cottage as they had
to be lifted vertically into the small entrance lobby, rotated 90
degrees and then lifted up a small step and slid into the utility
room before being propped horizontally against the wall. The sheets
themselves are solid, bulky and smooth on both surfaces, so they are
not easy to get a grip on and I had six to get indoors. After three I
was virtually exhausted and almost in tears – I so needed my trusty
sidekick at that point, if only to shout words of encouragement - but
I managed to get them all in and then drove back to Jeni's where she
stepped into super-hero mode with a reviving cuppa and then cooked
supper. I was so glad that I'd persevered with moving them as it
poured with rain that night!
I didn't do any work at
the cottage over the weekend as the bitumen coating had to dry out.
Luckily I hadn't had to do the whole floor as, on most of it, we'd
laid a damp proof membrane (why didn't we do the entire floor?). So I
was able to attend the Wells Festival of Literature on Sunday to hear
four speakers talking about different aspects of nature and the
countryside under the banner of the Somerset Wildlife Trust. Jeni had
also managed to get a ticket so we spent a couple of hours sitting in
a large marquee in the grounds of the Bishop's Palace, before
emerging and going to investigate the Wells Food Festival which was
being held in the Market Square, along the Palace moat and in a
nearby park. It is amazing the range of foods that are available from
the local-ish area – all sorts of cheeses made from goat, sheep and
cows milk, biltong, rare-breed bacon, ciders, artisan breads, cakes,
chocolate, etc. My favourite Lovett pies were also there so we bought
four to help Phil sell out so that he could look around the rest of
the festival – we saw him wandering around later, so he must have
sold out. We bumped into several people that we knew and altogether
had a lovely day off.
All too soon Monday
rolled round and with it the need to visit Wells Tyres again – this
time because I thought my exhaust was blowing. It was, and I needed
two or possibly three bits of the four-part system replaced – the
catalytic converter end had only been replaced just over a year ago,
so that was OK. Phew! It was booked in for Tuesday morning so I was
able to use it to drive to Glastonbury to buy the tiles, before
driving back to Draycott and fighting with the flooring boards again.
Because the weather was decidedly damp I set up workshop in the
utility room which is quite a restricted workspace – once I'd got a
flooring board on to the Workmate there was barely room for me to
squeeze past.
The first board I had
to lay was virtually full length with a notch cut out of one end to
fit into a doorway. I measured twice (measure twice, cut once!) and
felt quite proud of myself when it only needed minor adjustment in
situ. Before I laid board number 2 (again, full length with a notch
cut out) I checked to see whether it was a tongue or a groove that I
needed to match up with board number 1, and that was when I read the
1.5 inch high stencilled lettering on the boards that said 'This side
up'. Of course, I'd laid board number 1 with the other side up –
idiot! So I had to cut a new board and utilise the wrongly-cut board
as board number 2 which was narrower. After that first mistake things
went a bit more easily and most of the other boards were a lot
shorter and easier to manipulate into place. By the end of the day I
had all the flooring down and sealed with PVA and the good bit was
that I had only used four of the six boards so could return the
others for a refund. Bonus!
![]() |
| First tiles laid on top of new flooring board |
On Tuesday morning I
took my car in to have the exhaust done, only to find when I got
there (a distance of 0.25 mile at most) that I had another flat tyre!
I really couldn't believe this run of bad luck – my car rarely
gives me any problems. The worst part was that I had to kick my heels
in a rain-soaked Wells for an hour when I could have been doing the
kitchen floor. From Wells I drove to Glastonbury and bought an
electric tile cutter from Screwfix as I couldn't bear the thought of
doing fiddly little cuts and angles with a manual one. Back to
Draycott and my work day finally started at about 11.30! Assembling
the tile cutter was a bit tricky as the photos in the handbook were a
bit dark and I couldn't work out where one bit went at all, at first,
but once it was up and running things went pretty smoothly. By the
end of the day I had all the whole tiles laid and was ready to start
cutting the edge ones, but my hands were aching pretty badly from
mixing the tile adhesive manually in a bucket so I gave up and went
'home'.
It was with great
trepidation that I approached my car in the morning and checked it
all round, but it was fine so I got to the cottage in good time, only
to decide to go and get some more tile adhesive from CRS. I also
bought a mechanical mixer (like a giant whisk attachment) for my
drill to save the wear and tear on my poor hands, and asked for
someone to collect the spare flooring boards tomorrow, as it would be
my last day on-site. The guys in there have been really patient and
helpful and I've learned quite a bit!
Armed with all the kit
I could possibly need I managed to cut and lay all the rest of the
floor tiles by mid-afternoon and then painted one of the bedroom
walls and fixed the curtain rail which had fallen down. Things were
beginning to look better!
Thursday dawned (very
early – Jeni and I were drinking cups of tea at 5.30am!) and my
designated 'final day'. I should have been in Cornwall on Monday, but
kept having to defer my arrival as the job became larger and larger.
Luckily, Jo and James were very understanding and just said 'Come
when you've finished, we're flexible'. I finished cleaning the
cottage and doing last minute bits and pieces before I started on the
grouting as I wouldn't be able to walk through the kitchen into the
rest of the cottage once I'd done it.
The grouting took
longer than I'd expected, particularly cleaning up the tiles
carefully afterwards, as it said it's almost impossible to get off
once it's dried, so I spent ages on my hands and knees with a damp
sponge and a bucket of water – brought back 'happy' memories of my
house-cleaning days! I was really pleased with the effect once I'd
finished and the kitchen does look a lot better now. Was it all worth
it? I really hope so, especially as I may well go back in a few weeks
time (after Cornwall) to tile the small entrance lobby and the steps
down into the kitchen using the two boxes of tiles I have left
over!
Jeni reckons that I'm some sort of a
super-hero but I think I'm just bloody pig-headed – I refuse to be
defeated by jobs once I've started them, often to my own physical
detriment!
![]() |
| The finished floor! |




You are! You are a super-hero!! Glad you posted photos, as of course I didn't get to see the results of your labours - it looks brilliant! Well done Mummingfrood, you are indeed most hoopy :-D xxxxxxxx
ReplyDelete